![](https://jrccivils.com.au/wp-content/uploads/2013/12/Picture1.png)
![](https://jrccivils.com.au/wp-content/uploads/2013/12/Picture2.png)
![](https://jrccivils.com.au/wp-content/uploads/2013/12/Picture3.png)
![](https://jrccivils.com.au/wp-content/uploads/2013/12/Picture4.png)
Project: Bow River Bridge
Location: 168km south of Kununurra, WA
Client: BMD Constructions
Project Value: $30.0m
Completion: Mid 2018
Project Background
Replacement of old bridge at Bow River Bridge for Main Roads Western Australia.
Scope of Works
Construction of Bridge No. 817a over Bow River, along the Great Northern Highway, South of Kununurra. The bridge is located approximately 168km south of Kununurra and 31km North of Warmun.
Challenges Overcome
- Remote Location
- Limited time to complete the bridge in the dry season