The project involved the construction of seven in-situ concrete pier protection walls surrounding road bridge structures along the new Ellenbrook railway line.
Preparing existing structures, full FRP (Formwork, Reo Pour) package, including formwork design, earthing and welding. Entire project utilisied 132 tons of steel reinforcement and 1520m3 of concrete.
Preparing existing structures, full FRP (Formwork, Reo Pour) package, including formwork design, earthing and welding. Entire project utilisied 132 tons of steel reinforcement and 1520m3 of concrete.